Black in the silicone, a stain on the ceiling below? One team plans, tanks and tiles the whole room: the plumber, the electrician and both tilers work for Saltgrass, so it is never handed on to strangers.
strip out to handover on most family
bathrooms, with a working loo each night
Flood tested before a tile goes on
The shower you have now
It starts with a bit of black silicone.
A corner like this is often where it starts. The worries, in words like these:
The kitchen ceiling, below
Example photo A tired shower corner, ringed where the trouble shows.
11.
“The silicone has gone black again. Bleach shifts it for a while, then it’s back.”
22.
“The grout’s cracking, and a tile by the tray has a crack right through it.”
33.
“The seal at the corner of the tray has come away. I can see the gap, not where the water goes.”
44.
“There’s a brown ring on the kitchen ceiling, right under the shower, and it keeps growing.”
5And the one no photo shows: “We’ve put it off for years, because we can’t face being without a toilet.”
The same room, refitted
Same room. Dry behind the tiles.
The bathroom from its doorway, as it was and as it was left. Pull the blade across, then read each worry answered.
AfterBefore
Example pair One bathroom from the same doorway, before and after a refit.
1
Black siliconeThe mouldy silicone goes with the old suite, and the new shower is tanked before anything is sealed, so fresh silicone is never all that keeps water out.
2
Cracked groutCracked tiles and tired grout go at the strip out. The new tiles are bedded and grouted on a tanked wall.
3
The lifted sealA waterproof membrane runs over the floor and up the walls, so water that finds a gap meets the membrane, not the boards.
4
The ceiling belowFlood tested before tiling: a leak shows on a bare floor, not on your kitchen ceiling.
5
No toiletA working toilet every night of the refit, however far the strip out has gone.
What we fit
What we fit, and from what.
Five kinds of room, each fitted by the same six people. Guide prices are fitted, for a typical room; yours is itemised after the free design visit.
Cloakroom
A downstairs loo and basin, tucked under the stairs or into a corner.
Ends“One toilet for the whole house.”
from£3,900fitted
Walk-in shower
Shower rooms and en suites: a low tray and one fixed glass screen, with no door to squeegee.
Ends
3
“The seal at the corner of the tray has come away.”
Floor Small
Cleaning Easy
from£8,600fitted
Family bathroom
The full refit, with a bath and the shower over it behind a hinged screen. The toilet works every night of it.
Ends
1
2
5
“Black silicone, cracked grout, and how do we manage without a toilet?”
Floor Medium
Cleaning Some
from£9,800fitted
Wet room
One tanked floor falling to a linear drain, with nothing to step over.
Ends
4
“A brown ring on the kitchen ceiling, under the shower.”
Floor Small
Cleaning Easy
from£11,600fitted
Bath and separate shower
A freestanding or fitted bath, with its own shower enclosure beside it.
Ends“Someone always wants the bath when I need the shower.”
Most bathroom trouble starts where nobody looks: under the tray, inside the grout, above the ceiling. Here is a shower floor drawn in section, from the joists up.
Example drawing
Joists, boards and the ceiling belowThe floor as it is. The ceiling under it is the one that stains.
A former laid to a fallSo the water runs to the drain and never sits.
The waterproof membraneOver the floor and up the walls, sealed at the corners and into the drain.
The flood testWater stands on the membrane before Saltgrass tiles over it.
Tiles from the dry layoutBedded and grouted over the tested membrane.
A linear drainAt the low end of the fall, clamped into the membrane.
Two steps before anything comes out, then the usual run for a family bathroom.
First
A free design visit
We measure up, look at the pipes and talk it through.
You: Show us the room and tell us what annoys you about it.
4 working days later
A drawn plan and itemised quote
Free, with nothing to sign.
You: Read it, ask anything, and pick your start date.
12345678910
Day 1
Strip out
Old suite, tiles and boards out, pipes capped, and the loo back on before we go.
You: Clear the room and the shelves.
Day 3
First fix
New pipework and wiring while the walls are open, notified under Part P.
You: Nothing: the toilet still works each night.
Day 6
Tanking and tiling
Membrane on and flood tested, then tiled from the dry layout.
You: Look at the layout on its board if you like.
Day 10
Fit off
Suite, taps, glass and lights connected and the room cleaned.
You: Walk round it with us and keep the Part P certificate.
Example run
Tile boardLaid out dry on a board before fixing
About Saltgrass
A tiler's eye on every job.
Nell Garrow tiled other firms' bathrooms for ten years before she started Saltgrass in 2012. Now six of us plan, plumb, wire and tile each room ourselves, and a call-back comes from Nell or Sam.
With two small children, a night without a toilet was my worst fear. It never happened once in the whole refit.
Came in with
Black mould in the silicone, two small children and one toilet.
Went home with
A sealed shower over the bath, and a loo that worked every night.
Hannah R.
Ringmer Family bathroom
Example review
Nell talked us out of the corner bath. She was right: the room feels twice the size and nobody misses it.
Came in with
Cracked tiles round a corner bath nobody used, under a sloping ceiling.
Went home with
A shower room tiled in one go that feels twice the size.
Tom and Priya S.
Kingston near Lewes Loft en suite
Example review
They found rot under the old tray, stopped, and sent me photos before touching it. The extra cost came on one line, explained.
Came in with
A lifted tray seal, and a brown ring on the kitchen ceiling under it.
Went home with
A tanked shower, a dry ceiling, and the rot fixed on one priced line.
Margaret D.
Newick Shower room
Easier bathrooms
Walk in with no step.
Level showers, fold-down seats, grab rails and a taller loo, planned with you and whoever helps you day to day. The room gets safer and still looks like a bathroom.
What people ask on the design visit, answered here first.
How much will my bathroom cost?
Fitted guide prices start at £3,900 for a cloakroom and £9,800 for a family bathroom with a shower over the bath. Your own price is itemised on the drawn plan after the free design visit.
How long will we be without a bathroom?
You keep a working toilet every night of the refit. Most family bathrooms take 10 working days from strip out to handover; the design visit is the time to ask how those days fall for your room.
Who will actually be in our house?
Our own team: Nell designs and tiles, with a second tiler, a plumber, an electrician and a fitter, and Sam in the office. Saltgrass does not hand your room on to anyone else.
What if it leaks after you have gone?
The waterproofing behind the tiles carries our own five-year guarantee, and it is flood tested before a tile covers it.
Do I have to sign anything at the visit?
No. The visit, the drawn plan and the itemised quote are free. The plan reaches you 4 working days after we have measured up.
Will the electrics be signed off?
Yes. Our electrician notifies the bathroom electrics under Part P of the Building Regulations, and you get the certificate.
Free design visit
A dry room, tiled true.
Show us the room you've got. We measure up, look at the pipes and talk through what you want; a drawn plan and itemised quote follow four working days after the visit, with nothing to sign.