Bathrooms designed and fitted in Lewes

Tiled true. Sealed tight.

Black in the silicone, a stain on the ceiling below? One team plans, tanks and tiles the whole room: the plumber, the electrician and both tilers work for Saltgrass, so it is never handed on to strangers.

10 working days

strip out to handover on most family
bathrooms, with a working loo each night

A finished walk-in shower just after use: water beaded on a clear glass screen and sea-green stacked tiles, a round steel shower head above and a towel on a heated rail

Flood tested before a tile goes on

The shower you have now

It starts with a bit of black silicone.

A corner like this is often where it starts. The worries, in words like these:

Close in at the corner of an old shower tray: yellowed silicone spotted with black mould, a cracked grout line and a hairline crack through a white tile, and the seal at the front corner of the tray lifted away from the tiles
Example photo A tired shower corner, ringed where the trouble shows.
  1. 1. “The silicone has gone black again. Bleach shifts it for a while, then it’s back.”
  2. 2. “The grout’s cracking, and a tile by the tray has a crack right through it.”
  3. 3. “The seal at the corner of the tray has come away. I can see the gap, not where the water goes.”
  4. 4. “There’s a brown ring on the kitchen ceiling, right under the shower, and it keeps growing.”

And the one no photo shows: “We’ve put it off for years, because we can’t face being without a toilet.”

The same room, refitted

Same room. Dry behind the tiles.

The bathroom from its doorway, as it was and as it was left.

The same bathroom after the refit, from the same doorway: a walk-in shower with one fixed glass screen and sea-green stacked tiles, a white basin on a wall-hung vanity, a new close-coupled toilet and a chrome towel rail A tired bathroom seen from the doorway: a curved corner shower with cloudy doors on a stained tray, white tiles with grey grout, a pedestal basin under a speckled mirror, a close-coupled toilet and a towel radiator
Example pair One bathroom from the same doorway, before and after a refit.
  1. Black silicone The mouldy silicone goes with the old suite, and the new shower is tanked before anything is sealed, so fresh silicone is never all that keeps water out.
  2. Cracked grout Cracked tiles and tired grout go at the strip out. The new tiles are bedded and grouted on a tanked wall.
  3. The lifted seal A waterproof membrane runs over the floor and up the walls, so water that finds a gap meets the membrane, not the boards.
  4. The ceiling below Flood tested before tiling: a leak shows on a bare floor, not on your kitchen ceiling.
  5. No toilet A working toilet every night of the refit, however far the strip out has gone.

What we fit

What we fit, and from what.

Five kinds of room, each fitted by the same six people. Guide prices are fitted, for a typical room; yours is itemised after the free design visit.

  • A finished cloakroom under the stairs: a corner basin, a close-coupled toilet under the slope and teal patterned floor tiles

    Cloakroom

    A downstairs loo and basin, tucked under the stairs or into a corner.

    Ends “One toilet for the whole house.”

    from £3,900 fitted

  • A walk-in shower with a low slate-grey tray, one fixed glass screen on a black wall profile and a rain shower head

    Walk-in shower

    Shower rooms and en suites: a low tray and one fixed glass screen, with no door to squeegee.

    Ends “The seal at the corner of the tray has come away.”

    • Floor Small
    • Cleaning Easy

    from £8,600 fitted

  • A white bath in a white-tiled alcove with a hinged glass screen and a shower on a slide riser

    Family bathroom

    The full refit, with a bath and the shower over it behind a hinged screen. The toilet works every night of it.

    Ends “Black silicone, cracked grout, and how do we manage without a toilet?”

    • Floor Medium
    • Cleaning Some

    from £9,800 fitted

  • A finished level wet room: pale grey floor tiles running to a long steel drain, one glass screen and a fold-down seat

    Wet room

    One tanked floor falling to a linear drain, with nothing to step over.

    Ends “A brown ring on the kitchen ceiling, under the shower.”

    • Floor Small
    • Cleaning Easy

    from £11,600 fitted

  • A freestanding bath with a floor-standing tap on wood-effect tiles, beside a glazed shower enclosure

    Bath and separate shower

    A freestanding or fitted bath, with its own shower enclosure beside it.

    Ends “Someone always wants the bath when I need the shower.”

    • Floor Large
    • Cleaning More

    from £13,900 fitted

Ask for a drawn plan

Behind the tiles

What goes on behind the tiles.

Most bathroom trouble starts where nobody looks: under the tray, inside the grout, above the ceiling. Here is a shower floor drawn in section, from the joists up.

Example drawing
  • Joists, boards and the ceiling below The floor as it is. The ceiling under it is the one that stains.
  • A former laid to a fall So the water runs to the drain and never sits.
  • The waterproof membrane Over the floor and up the walls, sealed at the corners and into the drain.
  • The flood test Water stands on the membrane before Saltgrass tiles over it.
  • Tiles from the dry layout Bedded and grouted over the tested membrane.
  • A linear drain At the low end of the fall, clamped into the membrane.
How a refit runs

How a refit runs

Ten working days, in order.

Two steps before anything comes out, then the usual run for a family bathroom.

  1. First

    A free design visit

    We measure up, look at the pipes and talk it through.

    You: Show us the room and tell us what annoys you about it.

  2. 4 working days later

    A drawn plan and itemised quote

    Free, with nothing to sign.

    You: Read it, ask anything, and pick your start date.

  1. Day 1

    Strip out

    Old suite, tiles and boards out, pipes capped, and the loo back on before we go.

    You: Clear the room and the shelves.

  2. Day 3

    First fix

    New pipework and wiring while the walls are open, notified under Part P.

    You: Nothing: the toilet still works each night.

  3. Day 6

    Tanking and tiling

    Membrane on and flood tested, then tiled from the dry layout.

    You: Look at the layout on its board if you like.

  4. Day 10

    Fit off

    Suite, taps, glass and lights connected and the room cleaned.

    You: Walk round it with us and keep the Part P certificate.

Example run

Sea-green and white tiles laid out dry in a chequer on a plywood board at Saltgrass's workshop bench, white spacers at every joint, shelves of sample tiles behind

Tile board Laid out dry on a board before fixing

About Saltgrass

A tiler's eye on every job.

Nell Garrow tiled other firms' bathrooms for ten years before she started Saltgrass in 2012. Now six of us plan, plumb, wire and tile each room ourselves, and a call-back comes from Nell or Sam.

How a refit runs

Recent rooms

Three rooms from this year.

In the villages around Lewes, from August to October.

  • A finished loft en suite under a sloping ceiling: a glass shower door, and a vanity basin under a roof window
    En suite

    Loft en suite under a sloping ceiling

    Kingston near LewesOctober 2026

  • A finished level wet room seen through a doorway: grey tiles to a linear drain, one glass panel, a fold-down seat, two white grab rails and a close-coupled toilet
    Wet room

    Level wet room off a downstairs bedroom

    RingmerSeptember 2026

  • A cottage bathroom: a roll-top bath under a sash window, green handmade tiles to dado height and a pedestal basin
    Family bathroom

    Green handmade tiles and a roll-top bath

    Barcombe CrossAugust 2026

Book a design visit

Reviews

Heard after the first shower.

  • Example review

    With two small children, a night without a toilet was my worst fear. It never happened once in the whole refit.

    Came in with
    Black mould in the silicone, two small children and one toilet.
    Went home with
    A sealed shower over the bath, and a loo that worked every night.

    Hannah R.

    Ringmer Family bathroom

  • Example review

    Nell talked us out of the corner bath. She was right: the room feels twice the size and nobody misses it.

    Came in with
    Cracked tiles round a corner bath nobody used, under a sloping ceiling.
    Went home with
    A shower room tiled in one go that feels twice the size.

    Tom and Priya S.

    Kingston near Lewes Loft en suite

  • Example review

    They found rot under the old tray, stopped, and sent me photos before touching it. The extra cost came on one line, explained.

    Came in with
    A lifted tray seal, and a brown ring on the kitchen ceiling under it.
    Went home with
    A tanked shower, a dry ceiling, and the rot fixed on one priced line.

    Margaret D.

    Newick Shower room

Easier bathrooms

Walk in with no step.

Level showers, fold-down seats, grab rails and a taller loo, planned with you and whoever helps you day to day. The room gets safer and still looks like a bathroom.

Plan an easier bathroom
A finished level shower: a padded seat folded down under the shower, the mixer and a hand shower beside it, a white grab rail on the side wall by the seat, and a linear drain in the level floor

Questions

Before you book.

What people ask on the design visit, answered here first.

How much will my bathroom cost?

Fitted guide prices start at £3,900 for a cloakroom and £9,800 for a family bathroom with a shower over the bath. Your own price is itemised on the drawn plan after the free design visit.

How long will we be without a bathroom?

You keep a working toilet every night of the refit. Most family bathrooms take 10 working days from strip out to handover; the design visit is the time to ask how those days fall for your room.

Who will actually be in our house?

Our own team: Nell designs and tiles, with a second tiler, a plumber, an electrician and a fitter, and Sam in the office. Saltgrass does not hand your room on to anyone else.

What if it leaks after you have gone?

The waterproofing behind the tiles carries our own five-year guarantee, and it is flood tested before a tile covers it.

Do I have to sign anything at the visit?

No. The visit, the drawn plan and the itemised quote are free. The plan reaches you 4 working days after we have measured up.

Will the electrics be signed off?

Yes. Our electrician notifies the bathroom electrics under Part P of the Building Regulations, and you get the certificate.

A bathroom in the evening: the bath run, a candle lit on its edge, a warm wall light and towels folded on a stool

Free design visit

A dry room, tiled true.

Show us the room you've got. We measure up, look at the pipes and talk through what you want; a drawn plan and itemised quote follow four working days after the visit, with nothing to sign.